Helpline >> 0195-4230290
EMAIL Us >> kmr-phed@jk.gov.in / kmrphed@gmail.com

Public Health Engineering Department

Save Water Save Life.

Tenders


S.NoSubjectCorrigendum/ AddendumLast Date of SubmissionExtended DateNIT NumberOffice Name
1 Supply of 2000 Metric Tons of ISI Marked Stable Bleaching Powder Grade I as per IS 1065/89 with upto date amendments  Jan 21, 2019Jan 01, 1980PHE/M&P/21 
2 Supply of ISI Marked HDPE and PPR pipes  Jan 11, 2019Jan 01, 1980PHE/M&P/24 
3 Supply of DG sets for PHE Mechanical Division South Awantipora  Jan 23, 2019Jan 01, 1980PHE/M&P/23 
4 Laying / fitting of 80 mm dia G.I. supply line from 70000 gallons S.R. at plant upto old S.R. & existing system of Darbagh at Gandtal New Theed for WSS Syedpora Darbagh  Dec 29, 2018Dec 29, 201816/PHED/RWSD/Civil-SHG of 2018–19 
5 Construction of Anchor blocks for laying of pipes at Hanging Spots at Faqir Gujjari Dara for WSS Faqir Gujjari Dara under JKIDFC  Dec 29, 2018Dec 29, 201816/PHED/RWSD/Civil-SHG of 2018–19 
6 Laying / fitting of 65/ 50 mm dia G.I. main supply line to Darbagh and Muftibagh from Nayed Chowk upto Charihar and Charihar to Muftibagh for WSS Syedpora Darbagh under JKIDFC  Dec 29, 2018Dec 29, 201816/PHED/RWSD/Civil-SHG of 2018–19 
7 laying and fitting of G.I. pipes for WSS khan Patti Mammer (revival of Pilot Programme) under JKIDFC  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
8 Extension of service line to newly developed Basti at Chakoo Tulmulla by way of L/F of 25/20 mm dia G.I. pipe for WSS Aug. Tulmulla Dangerpora under JKIDFC  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
9 laying and fitting of pipes for WSS Chohan Patti Mammer (revival of Pilot Programme) under JKIDFC  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
10 Improvements/ Reactivation of existing pipe network for WSS Ganiwan Bondaji Chopan Mohalla (revival of Pilot Programme) under JKIDFC  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
11 Improvements to existing system and extension of new household at Astanbal Ganiwan for WSS Astanbal Ganiwan (revival of Pilot Programme) under JKIDFC  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
12 Laying and fitting of G.I. pipes for WSS Locus Nar (revival of Pilot Programme) under JKIDFC  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
13 laying and fitting of G.I pipe network for WSS Pakhtoon Patti Waniyarm under JKIDFC.  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
14 Laying / fitting of 200 mm dia D.I. Raw water main from Sindh extension canal to PST of 1.10 MGD R.S.F. Plant at Beehama Hills for WSS Ganderbal Town  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
15 Repairs to Service Reservoir by way of R.C.C Jacketing incld laying and fitting of Pipes for W.S.S Badi Pathri Thune (Revival of Pilot Prog) under JKIDFC  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
16 Revamping of filtration plant and improvement / extension of pipe network for W.S.S Surfraw Patti No.4 under JKIDFC  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
17 Revamping of S.S.F. Plant at Haknar including improvement / extension of intake main and distribution system W.S.S Haknar under JKIDFC  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
18 Revamping of slow sand filtration plant at Dard Udder and laying and fitting of pipes for extension of offtake point and re-activation of existing network for W.S.S Dardudder under Revival of Pilot Programme (JKIDFC)  Jan 02, 2019Jan 02, 201915/PHED/RWSD/Civil of 2018–19 
19 Laying of extension line near the house of Yousuf Bajard and Mohammad Younis Sangoo at Lamen for WSS Baba Nagri under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/SHG of 2018–19 
20 laying and fitting of 40/25/20 mm dia GI pipes from Masjid Sharief Dangerpora upto the House of Gh Ahmad Tantray for WSS Dangerpora Tullmulla under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/SHG of 2018–19 
21 P/F of M.S Double collars to 150 mm dia D.I. incld. providing / laying of cement concrete blocks at Dar Mohalla Sheikhpora for WSS Gogjigund Malikpora under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/SHG of 2018–19 
22 Carriage of Bleaching Powder/Ferric Alum from Divisional store to Beehama Hills for WSS Ganderbal Town under JKIDFC.  Dec 29, 2018Dec 29, 201814/PHED/RWSD/SHG of 2018–19 
23 Re- activation of water supply scheme Brangdoori by way of improvements /extension of pipe network for WSS Brangdoori (revival of Pilot Programme ) under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/SHG of 2018–19 
24 Improvements to existing system and extension of distribution system to newly households for WSS New Colony Ganiwan (revival of Pilot Programme) under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/SHG of 2018–19 
25 Re- activation of water supply scheme Katti wangath by way of improvements /extension of pipe network for WSS Katti Wangath (revival of Pilot Programme ) under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/Civil of 2018-19 
26 Re- activation of water supply scheme Barindara Chattergul by way of improvements /extension of pipe network for WSS Barindra Chattergul (revival of Pilot Programme ) under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/Civil of 2018-19 
27 Improvements to intake main by way of Extension and Re-Activation of existing distribution system for WSS Chechipatti Ganiwan (revival of Pilot Programme) under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/Civil of 2018-19 
28 Restoration / Reactivation of S.R. by way of laying and fitting of GI pipes for WSS Devdar Patti Thune under (Revival of Pilot Programme) under JKIDFC.  Dec 29, 2018Dec 29, 201814/PHED/RWSD/Civil of 2018-19 
29 Revamping of S.S. filtration plant including improvement to pipe network for W.S.S Gulab Doori Yechama under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/Civil of 2018-19 
30 Revamping of S.S.F. Plant at Akhal including laying and fitting of pipes for extension of Sub-main and distribution system for W.S.S Akhal under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/SHG of 2018–19 
31 Revamping of S.S.F. Plant including improvement /extension of intake main and distribution system W.S.S Fraw under JKIDFC  Dec 29, 2018Dec 29, 201814/PHED/RWSD/SHG of 2018–19 
32 Supply of ISI Marked Centrifugally Cast (spun) Ductile Iron Pipes as Per IS 8329/2000 read with uptodate amendments  Jan 18, 2019Jan 01, 1980PHE/M&P/22 
33 cONSTRUCTION OF CGI SHED & ALLIED WORKS  Jan 07, 2019Jan 07, 2019E NIT 23 
34 Supply of ISI Marked Centrifugally Cast Spun Ductile Iron Pipes  Jan 18, 2019Jan 01, 1980PHE/M&P/22 
35 Supply of ISI Marked Centrifugally Cast Spun Ductile Iron Pipes as per IS 8329:2000 read with uptodate amendments  Jan 18, 2019Jan 01, 1980PHE/M&P/22 
36 Various Works 2.  Dec 13, 2018Dec 27, 201817 / PHA of 2018-19 
37 L/F of 40mm dia pipes along Mattan Shamsipora road under PMGSY (Shifting of utilities).  Dec 28, 2018Dec 20, 201832 of 2018-19 
38 L/F of GI pipes at Chaklipora WSS Chaklipora under JKIDFC  Dec 28, 2018Dec 20, 201832 of 2018-19 
39 L/F of GI pipes for village Andoo WSS Andoo Pushroo under JKIDFC  Dec 28, 2018Dec 20, 201832 of 2018-19 
40 L/F of pipes for supply main sub main and distb system at village Pahloo WSS Andoo Pushroo under JKIDFC  Dec 28, 2018Dec 20, 201832 of 2018-19 
41 L/F of pipes for village Kotheir incld Dugg Mohallah WSS Andoo Pushroo under JKIDFC  Dec 28, 2018Dec 20, 201832 of 2018-19 
42 L/F of 600mm dia DI supply main from RD 0 to 300 mtrs WSS Kokernagh Garden (Junk of pipes) under languishing programme.  Dec 28, 2018Dec 20, 201832 of 2018-19 
43 Constt. of sluice chamber for filtrration plant WSS Chaklipora under JKIDFC.  Dec 28, 2018Dec 20, 201832 of 2018-19 
44 Completion of 40000 gallons capacity per day capacity sedementation tank cum crude filter for WSS Chaklipora under JKIDFC.  Dec 28, 2018Dec 20, 201832 of 2018-19 
45 Constt. of sluice chamber for existing SR for village Pahloo WSS Andoo Pushroo  Dec 28, 2018Dec 20, 201832 of 2018-19 
46 Repairs to fencing intake chamber collection chamber intake and drain at head site WSS Chaklipora under JKIDFC  Dec 20, 2018Dec 20, 201832 of 2018-19 
47 Construction of 46000 gallons capacity SSFP at Matti for WSS Sheikhpora Matti under languishing programme.  Dec 20, 2018Dec 20, 201832 of 2018-19 
48 Construction of Retaining wall with devri stone face for beautification to connect proposed 450mm dia gravity main from Kokernag spring source for various WSS (Junk of pipes under JKIDFC  Dec 28, 2018Dec 20, 201832 of 2018-19 
49 Constt. of chain link fencing around SR/SSFP of 0.46 lac gallons and allied structures at Matti of WSS Sheikhpora Matti under languishing programme  Dec 28, 2018Dec 20, 201832 of 2018-19 
50 Constt. of ornamental spring protection walls at Kokernag spring sourc for various water supply schemes WSS Development/sustainability of Kokernag spring under JKIDFC.  Dec 20, 2018Dec 20, 201832 of 2018-19 
51 L/F of supply main to village Khreti Geremanpora WSS Sheikhpora Matti GB under languishing programme  Dec 28, 2018Dec 20, 201832 of 2018-19 
52 Construction of 20000 gallons capacity SSFP at Daksum for WSS Daksum GB under languishing programme.  Dec 28, 2018Dec 20, 201832 of 2018-19 
53 Construction of 0.23 lac gallons capacity RCC SR at Sheikhpora Matti WSS Sheikhpora Matti under languishing programme. JKIDFC  Dec 28, 2018Dec 20, 201832 of 2018-19 
54 L/F of supply main to village Nagdraman WSS Sheikhpora Matti GB under languishing programme  Dec 28, 2018Dec 20, 201832 of 2018-19 
55 Various works1.  Dec 26, 2018Dec 26, 201816/PHAOF2018-19 
56 Supply of 2000 Metric Tons of ISI Marked Stable Bleaching Powder Grade I as per IS 1065-89 with upto date amendments  Jan 11, 2019Jan 01, 1980PHE/M&P/21 
57 Supply of Alumina Ferric Grade IV conforming to IS 299:2012 with upto date amendments  Jan 04, 2019Jan 01, 1980PHE/M&P/20 
58 L/F of main/sub main/distb system for WSS Nayina (Under NRDWP).  Dec 13, 2018Dec 14, 201829 of 2018-19 
59 Constt of check wall for spring at Bon Nambal WSS Nanil (Under UPD)  Dec 13, 2018Dec 14, 201829 of 2018-19 
60 Construction of intake chamber at head site Pethnu WSS Jablipora under languishing programme.  Dec 13, 2018Dec 14, 201829 of 2018-19 
61 Construction of 0.60 Lac Gallons Capacity RCC Service Reservoir at Khrew WSS Aug. Khrew Town under PMKKKY Programme.  Dec 22, 2018Dec 22, 2018e-NIT No.;15 / PHA of 2018-19 [ e-Tendering ] 
62 Supply of laboratory equipments along with all allied accessories for 35 No. Water Testing labs of Kashmir Valley  Dec 19, 2018Jan 01, 1980PHE/M&P/19 OF 2018-19 
63 Electric Works WSS BSF Frontier HQ campus (NSG)  Nov 28, 2018Nov 28, 2018PHE/MRD/TS/e-tendering/22 of 11/2018 
64 Mechanical Works WSS BSF Frontier HQ campus (NSG)  Nov 28, 2018Nov 28, 2018PHE/MRD/TS/e-tendering/22 of 11/2018 
65 Electric Works WSS. Kunzwera  Nov 28, 2018Nov 28, 2018PHE/MRD/TS/e-tendering/21 of 11/2018 
66 Mechanical Works WSS.Kunzwera.  Nov 28, 2018Nov 28, 2018PHE/MRD/TS/e-tendering/21 of 11/2018 
67 L/F of 20mm dia GI pipe line near Darul Aloom for Gujar Basti for WSS Bakura  Dec 08, 2018Dec 08, 201818 /PHED/RWSD/Civil-SHG of 2018–19 
68 L/ F of 50/40mm dia main service line Salman Farsi Colony Ishber from Shalimar Plant for WSS Meerak ShahAbad.  Dec 08, 2018Dec 08, 201818 /PHED/RWSD/Civil-SHG of 2018–19 
69 L/F of 25mm dia Service line upto the h/o Shakeel Ahmad (Bhat Mohalla) from Theed Road for WSS Gulshan Nagar New Theed  Dec 08, 2018Dec 08, 201818 /PHED/RWSD/Civil-SHG of 2018–19 
70 Extension of 25/20mm dia GI pipe line from Shaheen Tile Factory to Darul Aloom Hanfiya at Arch for WSS Buderkund.  Dec 04, 2018Dec 04, 201817 /PHED/RWSD/SHG of 2018–19 
71 L/f of 100mm dia DI pipe line supply main from SR to Takya Shah Mohalla, Sidiq & Mir Pora including tesing and commissioning for WSS Repora Bala.  Dec 04, 2018Dec 04, 201817 /PHED/RWSD/SHG of 2018–19 
72 Installation of washout arrangements to 200/150mm dia raw water main at spots from Wangath upto Firltration Plant at Yarimuqam for WSS Hari Dursum.  Dec 04, 2018Dec 04, 201817 /PHED/RWSD/SHG of 2018–19 
73 Providing , installation ,successful testing and commissioning of VerticalTurbine pumping unit at WSS Checki Chandergeer Bonpora.  Nov 26, 2018Nov 26, 2018PHE/MDNS/NIT/E-36 of 2018-19 
74 Electrical works at WSS Checki Chandergeer Bonpora.  Nov 26, 2018Nov 26, 2018PHE/MDNS/NIT/E-36 of 2018-19 
75 Mechanical works at WSS Checki Chandergeer Bonpora.  Nov 26, 2018Nov 26, 2018PHE/MDNS/NIT/E-36 of 2018-19 
76 Urgent repairs to Vertical Turbine pumping unit at Water Supply Scheme Model Town 1st Sopore  Nov 26, 2018Nov 26, 2018PHE/MDNS/NIT/E-36 of 2018-19